Start from the crop, not the structure

Write down the crop, the target yield per square metre, the delivery window and the labour model before you ask for a drawing. A house sized from a catalogue will be wrong in one of those four places.

Fix the four numbers first

Span, bay, gutter height and column grid. Everything else — vents, screens, heating, irrigation — hangs off those four, and changing them later is a rebuild, not an adjustment.

Write the design day

Give the supplier the summer design temperature, the winter minimum, the snow load and the wind speed for the site. 'Hot climate' is not a specification; 46 °C with 30 % RH is.

Define the interfaces

State who provides foundations, power connection, water supply, drainage and the boundary. Most site delays live at these five interfaces, not in the factory.

Ask for the same document set from every supplier

Layout, structure drawings, equipment schedule, bill of materials, packing list and a commissioning plan. Comparing quotes without a common document set compares prices, not scope.

Shortlisting suppliers? Get one brief in front of them instead of five emails.

Build a project brief →
Next step

Ask us the question this guide does not answer

Send your site and crop; we will answer in writing, with the assumption stated, within one working day.

Request a proposal Build a brief
Your project brief · 0 items Open brief Send to Eado