FAQ

Installation and commissioning

Straight answers, including the ones that end with "it depends" — and what it depends on.

Do you send crews?

Yes, for full installation, or supervisors if you prefer to use local labour. Both routes end with the same alignment and commissioning checks.

How long does erection take?

It depends on area, crew size and whether civil works are ready. A typical 1 ha glasshouse runs for several weeks with a full crew; we give a schedule with the proposal.

Who provides foundations and utilities?

Normally the buyer, to our drawings. It is stated in the scope table, because it is the interface where most site delays start.

What does handover include?

Installation records, alignment report, commissioning report, as-built drawings and an operator pack.

Next step

Ask a question that is not here

Send it with your country and crop. You get a written answer with the assumption stated.